Septic System Services That Fit Your Needs

Icon with simple house drawn in an orange circle

New Builds

Discuss the feasibility of your project and how to best move forward with permitting and design.

Black and orange icon with house, Garage, and Car drawn into a circle

Upgrades

Update an outdated septic system or add additional treatment options to support your expansion.

Black and orange icon with house inside a circle

Repairs

Fix any septic systems that have worn out with time or were damaged for any reason.

Here’s How It Works:

At Fox Onsite Solutions we take a client-centered approach to simplify the permitting process.

Any septic project can be broken into two phases:

Phase 1: Testing, Design, & Permitting

Phase 2: Install & Follow Up

Phase 1: Permitting, Testing, and Design

Contact: Client contacts us with specific details about their project, including project scope (ex bedroom addition), APN, address, and any other applicable information.

1

Proposal and Parcel Feasibility: Fox Onsite Solutions with contact you with your project feasibility, and if appropriate a proposal.

2

Agree to Terms + Deposit: If the proposal is acceptable the client signs the proposal and pays the retainer/deposit. Once both are completed by the client the consultant can start work.

3

Submit Permits + Schedule Testing: Applicable permits are submitted to the local jurisdiction and soil testing (percolation test + soil profile) is scheduled with the county.

4

Soil Testing: Soil Profile + Perc Testing + Report: Soil Testing (perc test) is conducted. This typically includes a Soil profile and Percolation testing Through this testing groundwater, soil type, and a soil application rate is determined. With the data collected a report is created.

5

Gather Maps + County Records: Consultant works with owner/civil/architect/surveyor to create a plan for the parcel. Through this information and existing county parcel records a site map is created.

6

Septic System Design + Permitting: A final design is determined based on site conditions/testing results. This final design package includes a county permit application, CAD site plan, testing report, and other required documents.

7

County Design Review: County reviews project design and testing submittal (typically 2-6 weeks). Conducts independent site visit to verify sizing.

8

Plan Approval + Building Clearance: County grants approval and sends out building clearance. Allowing for the project’s building plans to be submitted.

9

Phase 2: Install and Follow Up

Permit Issued by County : Once the building plans are approved the Septic permit is issued. Now the system can be installed by an approved, certified installer.

1

Select Contractor: Owner places the project to bid and selects contractor. Specialized contractors are needed for enhanced treatment system installation. List of approved contractors are available on the county website.

2

Order parts + Schedule install: Contractor and owner order parts and schedule install. Contacting county prior to start of work with proposed start date

3

System Installation + Preconstruction Meeting(Alt): Contractor installs the system per the design specifications. County inspector oversees critical points (water tight test, septic tank, leachfield, etc.). with periodic inspections. If an enhanced treatment system is to be installed a preconstruction meeting is required.

4

As built + Final Consultant Letter(Alt):  If the installed system varies from the design an “As Built” map is created to show all the component locations and important distances. If the project involves an enhanced treatment system (Alt. System) a final consultant letter is also submitted.

5

County Final: Final approval is signed off by the inspector and sent to the county so they can authorize the final occupancy of the home.

6

Services That We Provide:

How Long Does The Process Take?

Typical timeline for a septic consulting new/upgrades is 3-6 months from start to finish, dependent on multiple factors, such as weather, site demands, and county review time. Septic repairs/failures are typically 3 months shortened due to lack of planning involvement.

Further details on these factors include:

  • Significant county oversight and intimate local knowledge is required in order to receive the approval.

  • All testing is scheduled and observed by the local jurisdiction and must be done to specific standards.

  • If site conditions are poor, additional testing needs to be conducted, such as winter water testing, additional perc testing, and slope stability analysis.

  • California Groundwater regulations have become tighter and in turn, thereby, creating stricter septic regulations, making development and parcel additions uncertain.

  • California has required local jurisdictions to submit Local Agency Management Plan’s (LAMP). These recent requirements have brought updated regulations specific to each local jurisdiction.

Need more Onsite Wastewater Help?

Here are some other services that we offer:

Winter Water or Wet Weather Testing

Septic Feasibility/Site Visit Consultation

Real Estate Sale + Point Of Sale Inspection

FAQ’s

Fox Onsite Solutions Monterey Bay Banner Fallback Image.jpg

Get Started With Fox Onsite Solutions Today.